KT-2AM(R)
Automatic Shear Tester Machine For Motorcycle Battery
After battery has been finished the through-the-partition intercell welding, the shear tester will check the thru-the-partition intercell welding condition for the battery.
Sequence of Operation
After the battery is completed the process of welding, this battery will be delivered to the waiting gate of this testing machine, and conveyed into the testing position once time is ready the testing head (tooling) will move up and down automatically to process the continuous testing under fully automatic operation. If bad-weld condition was found, the machine will alarm and the conveyor will push the battery into the rejection area. After the completion of rejection cycle or testing cycle, the machine will continue next operation.
Feature
Utilities Requirement
Dimension and Weight
Other
Battery Equipments, Li-Ion Battery Equipment, Plastic Battery Casing.