Sequence of Operation
The operator loads the required tooling on this machine and pours the melting lead into the tooling. The operator only push the switches of cylinder after the melting lead is solidified, then the parts will drop out through the chute automatically.
Feature
It is easy to change the tooling. The finished products are exact and look well. It is easy to operate and maintain. The finished products are fallen through the chute automatically. The cycle duration: 30 seconds/cycle. (Depend on product condition)
Utilities Requirement
Compressed air consumption: 100nl/min. at 6 kg/cm2 Power: 2 KW.
Dimension and Weight
Approx. 850(L)* 850(W)*1350(H) mm Approx. 180kgs
Other